Ops 571 Final Exam (Newest) - Assignment

In: Other Topics

Submitted By UOPeHelp
Words 1350
Pages 6
OPS 571 Final Exam (Newest) – Assignment

1. A major competitive dimension that forms a company's strategic operational competitive position in their strategic planning is which of the following?
• Cost or price
• Focus
• Straddling
• Automation

2. In setting up a kanban control system you need to determine the number of kanban card sets needed. If the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the number of kanban card sets is needed?
• 27
• 20
• 5
• 30

3. Which of the following is a multifactor measure of productivity?
• Output/(Labor + Capital + Energy)
• Output/All resources used
• Output/(Materials)
• Output/Inputs

4. Which of the following is an alternative possible service encounter included in the service-system design matrix?
• Internet
• Automated teller (ATM)
• Face-to-face distance
• Questionnaire response

5. In development of an operations and supply chain strategy, which of the following may be an important product-specific criteria to consider?
• Learning curve
• Supplier after-sale support
• Production lot size
• Focus
Find the final exam answers here just a click away OPS 571 Final Exam (Newest)
6. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology?
• An hour lost at a bottleneck saves an hour for the entire system
• Do not allow bottlenecks to govern the flow of the line
• Utilization and activation of a resource are not the same
• Balance the capacities, not the flows

7. You have just been assigned to oversee a series of projects. Functional areas will loan you personnel for each project, and separate project managers will be responsible for separate projects. These project managers will…...

Similar Documents

Ops 571 Final Exam - Latest

...OPS 571 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://acehomework.com/OPS-571-Final-Exam-Latest-A-Work-349099.htm If You Face Any Problem E- Mail Us At JohnMate1122@gmail.com 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a......

Words: 642 - Pages: 3

Ops 571 Final Exam Latest Questions

...OPS 571 Final Exam www.StudentWhiz.com 1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project Want to see the Final Exam Assignment..?? Click OPS 571 Final Exam 2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3. Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keeps the value stream moving at minimum velocity. Want to check out the complete Assignment..?? Visit OPS 571 Final Exam Assignments 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting......

Words: 1271 - Pages: 6

Ops 571 Final Exam - Latest

...OPS 571 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://hwnerd.com/OPS-571-Final-Exam-Latest-2014-1493.htm?categoryId=-1 If You Face Any Problem E- Mail Us At Contact.Hwnerd@Gmail.Com 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains...

Words: 644 - Pages: 3

Ops 571 Final Exam - Latest

...OPS 571 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://acehomework.com/OPS-571-Final-Exam-Latest-A-Work-349099.htm If You Face Any Problem E- Mail Us At JohnMate1122@gmail.com 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a......

Words: 642 - Pages: 3

Ops 571 Final Exam - Latest

...OPS 571 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://acehomework.com/OPS-571-Final-Exam-Latest-A-Work-349099.htm If You Face Any Problem E- Mail Us At JohnMate1122@gmail.com 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a......

Words: 642 - Pages: 3

Ops 571 Final Exam Latest University of Phoenix

...OPS 571 Final Exam 1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project Find the final exam answers here OPS 571 Final Exam 2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3. Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. Want to download the Complete Assignment..?? Click OPS 571 Week 1 Quiz (Latest) 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of...

Words: 1576 - Pages: 7

Ops 571 Final Exam Latest Uop Course Assignments

...OPS 571 Final Exam http://www.uopetutors.com/ 1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards Find the final exam answers here OPS 571 Final Exam 3. Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of time • Discovery of the bottleneck operation 6.......

Words: 1503 - Pages: 7

Ops 571 Final Exam Latest Uop Final Exam Questions with Answers

...OPS 571 Final Exam Latest UOP Final Exam Questions With Answers 1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3. Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management Complete Answers here OPS 571 Complete Course 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of time • Discovery of the bottleneck......

Words: 1519 - Pages: 7

Ops 571 Final Exam - Latest

...OPS 571 Final Exam - Latest IF You Want To Purchase A+ Work Then Click The Link Below , Instant Download http://hwnerd.com/OPS-571-Final-Exam-Latest-2014-1493.htm?categoryId=-1 If You Face Any Problem E- Mail Us At Contact.Hwnerd@Gmail.Com 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains...

Words: 644 - Pages: 3

Ops 571 Final Exam

...A++PAPER;http://www.homeworkproviders.com/shop/ops-571-final-exam/ OPS 571 FINAL EXAM 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products? 13. There are many applications of poka-yokes in......

Words: 614 - Pages: 3

Ops 571 Final Exam - Latest 2014

...OPS 571 Final Exam - Latest 2014 IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load http://www.acehomework.net/?download=ops-571-final-exam-latest-2014 IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM OPS 571 Final Exam - Latest 2014 OPS 571 Final Exam - Latest 2014 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty......

Words: 657 - Pages: 3

Ops 571 Final Exam - Latest 2014

...OPS 571 Final Exam - Latest 2014 IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load http://www.acehomework.net/?download=ops-571-final-exam-latest-2014 IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM OPS 571 Final Exam - Latest 2014 OPS 571 Final Exam - Latest 2014 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty......

Words: 657 - Pages: 3

Ops 571 Final Exam

...OPS 571 FINAL EXAM A+ Graded Tutorial Available At: http://hwsoloutions.com/?product=ops-571-final-exam Visit Our website: http://hwsoloutions.com/ Product Description PRODUCT DESCRIPTION OPS 571 Final Exam, 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an......

Words: 630 - Pages: 3

Ops 571 Final Exam – Latest 2014

...OPS 571 FINAL EXAM – LATEST 2014 To purchase this, Click here http://www.activitymode.com/product/ops-571-final-exam-latest-2014/ Contact us at: SUPPORT@ACTIVITYMODE.COM OPS 571 FINAL EXAM - LATEST 2014 1.Which of the following is considered a major process flow structure? 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? 3.Which of the following is ISO 14000 primarily concerned with? 4. Which is the one correct value stream principle? 5. What is the starting point in developing a capacity plan for a health care operation? 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? 7.Which of the following is an element that addresses elimination of waste under lean production? 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: 10. Which of the following is one of the principles of reengineering? 11. Which of the following is a characteristic that can be used to guide the design of service systems? 12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving......

Words: 1897 - Pages: 8

Mkt 571 Final Exam (Newest)

...Share of shelf d) Trial rate 3. Creative strategies refer to the ________. a) amount of creative content in a communications message b) degree of innovation involved in the marketing of a product c) way marketers translate their messages into a specific communication d) novelty of a marketing communication 4. Top Gear is an award-winning British television series about motor vehicles, mainly cars. The show is presented by hosts who test drive new cars and provide reviews on the cars' performance, prices, and other factors. Which of the following personal communications channels is Top Gear closest to in description? a) Formal channel b) Sponsored channel c) Social channel d) Expert channel Find the final exam answers here MKT 571 Final Exam (Newest) 5. Mark feels that Shell delivers on its promises to supply the best gasoline possible to the public. His experiences with Shell have always been good, resulting in positive brand contact. Mark is most likely experiencing brand ________. a) parity b) alliance c) bonding d) essence 6. Robert is the owner of an automobile manufacturing company. He calls for a board meeting and tells his directors that he wants to build a car that lets drivers experience power and exhilaration. He tells them that the car must allow users to soar from 0 to 60 mph in about 4 seconds. He also says the price of the car must be affordable enough for anybody making a good salary. In accordance with the given scenario, Robert is......

Words: 1646 - Pages: 7